The Central Pollution Control Board (CPCB) is India’s apex authority for environmental protection. Under the Water (Prevention and Control of Pollution) Act, 1974 and Air (Prevention and Control of Pollution) Act, 1981, CPCB governs pollution control and categorizes industries into Red, Orange, Green, and White based on their pollution index.
1. Consent to Establish (CTE)
Purpose
CTE is mandatory before initiating any construction or installation of an industrial unit or project.
When to Apply
Apply before setting up the unit (whether new, expansion, or modernisation).
Scope Includes
• Site clearance
• Layout and plant design approval
• Pollution control planning
For Expansion Projects:
• Submit a separate application for CTE under both Water and Air Acts.
• Include documentation specific to expansion activities.
2. Consent to Operate (CTO)
Purpose
CTO is required before initiating any commercial production or operations.
When to apply: After setting up the plant and installing pollution control systems, but before starting operations.
Includes: Inspection by GPCB, checking of pollution control measures, and granting operational clearance.